Movement Block 9: Waste Generator
Block 9: Waste Generator-Producer
← Basel Knowledge Hub/Basel Movement Guide/ Block 9
Block 9 – Quick Reference
Waste Generator-Producer
Identifies the waste generator/producer tied to shipment origin.
Basel Basis
Annex V-B
Field Type
Waste source identity
Required For
All Basel movements
What Block 9 Captures
Block 9 links the movement to source accountability and origin records.
Generator identity must align with notification and source documentation.
How to Complete Block 9
1
Enter full legal generator name and address.
2
Confirm source identity against notification file.
3
Document any allowed same-as-notifier relationship clearly.
4
Validate source records before dispatch.
⚠️
Source Mismatch Creates Audit Findings
Unclear generator identity is a frequent cause of authority queries.
Common Errors – Correct Approach
Wrong
Incomplete or unverifiable generator details.
Correct
Use fully verifiable legal source identity.
Wrong
Mismatch with notification records.
Correct
Align Block 9 with approved source data.
Wrong
Unclear multi-generator declaration.
Correct
Use clear authority-approved multi-source structure.
Frequently Asked Questions
Can multiple generators be listed?
▼
Only where approval framework allows and is documented.
Is same-as-Block-3 allowed?
▼
Where legally accurate and accepted by authority practice.
Does generator need permits listed here?
▼
At minimum ensure generator identity links to permit-backed operations.
Supporting Documents
- Doc 6: Material Composition / Source Context- Material composition and hazardous waste fundamentals reference.
- Doc 6.1: Sample Collection / Worklist Form- Sample collection/worklist template for analytical tracking.
💡
DexMetal Expert Tip
Validate this block against your approved notification package before dispatch to reduce avoidable authority queries and shipment delays.
← Back to
Block 8: Carrier Signatures (Chain of Custody)
Next →
Block 10: Disposal/Recovery Facility
Need Help Completing Your Movement Document?
DexMetal’s Basel compliance tools guide you through every movement block with practical validation support.