Actual Date of Shipment (Movement Block 6)

Block 6: Actual Date of Shipment

← Basel Knowledge Hub/Basel Movement Guide/ Block 6

Block 6 – Quick Reference

Actual Date of Shipment

Captures the true dispatch date that starts movement timeline controls.

Basel Basis

Annex V-B

Field Type

Dispatch date control

Required For

All Basel movements

What Block 6 Captures

Block 6 establishes whether shipment occurred within consent validity.

It also anchors compliance checks across transport and customs records.

How to Complete Block 6

1

Enter the actual physical dispatch date only.

2

Verify date is inside consent validity window.

3

Align date with carrier handoff and transport records.

4

Lock the same date across all movement references.

⚠️

Date Mismatch Can Breach Consent

Shipping outside consent validity can lead to detention or non-compliance findings.

Common Errors – Correct Approach

Wrong

Using planned date instead of actual departure.

Correct

Record actual dispatch date only.

Wrong

Dispatch outside approved window.

Correct

Reschedule or obtain authority instruction first.

Wrong

Inconsistent dates across records.

Correct

Standardize final date across documents.

Frequently Asked Questions

Can date be corrected later?

Yes, with transparent documented correction workflow.

Does timezone matter?

Use local legal dispatch date used in transport records.

Should date match bill of lading date?

It should align with the operative dispatch event.

Supporting Documents

💡

DexMetal Expert Tip

Validate this block against your approved notification package before dispatch to reduce avoidable authority queries and shipment delays.

← Back to

Block 5: Actual Quantity (Weight/Volume)

Next →

Block 7: Packaging and Handling

Need Help Completing Your Movement Document?

DexMetal’s Basel compliance tools guide you through every movement block with practical validation support.

Explore the Knowledge Hub →

Section: Movement Doc · Type: reference